The Gemuruh Reservoir and its transmission pipeline system are vital infrastructures for meeting the raw water needs of Dabo Singkep City and surrounding areas in Lingga Regency. To ensure reliable supply and optimize operations, a supervision project was initiated focusing on both reservoir utilization and the construction of the raw water transmission pipeline.
The Supervision Consultant was appointed to oversee the implementation, ensuring construction and operational works were aligned with technical standards, environmental safeguards, and community needs. The consultant also provided critical inputs to enhance efficiency and sustainability of the water supply system.
🔸 Scope of Work
- Supervising construction and installation of raw water transmission pipelines.
- Monitoring civil works at the Gemuruh Reservoir, ensuring compliance with design and quality standards.
- Reviewing design adjustments and providing technical recommendations for optimization.
- Ensuring implementation of health, safety, and environmental (HSE) procedures.
- Coordinating with contractors, local government, and stakeholders for smooth execution.
- Preparing regular progress and technical evaluation reports.
🔸 Key Benefits
- Reliable raw water supply → strengthening water availability for households, businesses, and public facilities in Dabo Singkep.
- Optimized reservoir utilization → ensuring sustainable management of existing water resources.
- Improved infrastructure efficiency → through enhanced design review and construction supervision.
- Community resilience → reducing risks of water scarcity and supporting socio-economic development in Lingga Regency.
This project demonstrates the government’s commitment to sustainable water infrastructure development, ensuring that the Gemuruh Reservoir and transmission pipelines operate effectively to meet growing demand in the Riau Islands.