The Lamong River Basin, part of the Bengawan Solo Watershed, has long been prone to recurring floods that severely affect communities across Gresik and surrounding areas. To mitigate these impacts, the Ministry of Public Works and Public Housing (PUPR) through BBWS Bengawan Solo initiated a Flood Control Construction Project, with a dedicated supervision consultant ensuring quality and compliance throughout implementation.
The project includes the construction of riverbank protection structures such as concrete parapet walls, sheet piles, and supporting infrastructure designed to enhance resilience against flooding. The Supervision Consultant plays a vital role in monitoring technical works, ensuring safety compliance, and providing professional recommendations for optimized results.
🔸 Scope of Work
- Supervising construction activities for flood control structures.
- Reviewing and validating design adjustments to suit field conditions.
- Monitoring material quality, structural integrity, and construction schedule.
- Ensuring compliance with safety standards (K3) and environmental safeguards.
- Coordinating with stakeholders including BBWS Bengawan Solo, contractors, and local communities.
- Preparing technical reports, evaluations, and as-built documentation.
🔸 Key Benefits
- Flood risk reduction → minimizing community and infrastructure losses in Gresik Regency.
- Improved resilience → strengthening riverbank capacity against future hydrological events.
- Efficient project delivery → ensuring work is completed on time and in line with technical standards.
- Sustainable infrastructure → contributing to long-term water resources management in the Bengawan Solo Watershed.
This project strengthens flood resilience in Gresik Regency, East Java, serving as a crucial step in safeguarding communities along the Lamong River.





