The government, through the Sumatra River Basin Agency III, has undertaken the Review of Intake Development Design and Raw Water Transmission Pipeline project in Wonosari Village, Bengkalis Regency. As the demand for raw water continues to rise, this project aims to evaluate and redesign the intake system and transmission pipelines, ensuring a sustainable supply of clean water for the community.
Over six months, the project involved topographic, hydrological, and soil mechanics surveys, as well as technical and environmental analysis. The initial intake and pipeline designs were developed based on comprehensive studies, incorporating adjustments to enhance maintenance and operational efficiency. Additionally, the Budget Plan (RAB) and tender documents were prepared to support the construction phase.
Challenges such as delays in soil laboratory test results and limited coordination due to COVID-19 restrictions were successfully addressed through expedited technical completion and intensive stakeholder discussions. With the design review phase now complete, the project is ready to move into the construction phase, delivering a more efficient and sustainable raw water supply system.
Project Status: 100% Design Review Completed – Ready for Construction Implementation